See The Work
Original project case studies. Images are shown for illustration; no safety, material-compatibility, regulatory or performance claims are implied.
Correcting a Mantel's Finish—Without Taking It Down—in Under Three Hours
How ALR Springfield franchisee Terrence Ondatje used on-site laser cleaning to strip the wrong stain from a mounted fireplace mantel—preserving its rustic character—in under three hours.
Read Full Case StudyCorrecting a Mantel's Finish—Without Taking It Down—in Under Three Hours
How ALR Springfield franchisee Terrence Ondatje used on-site laser cleaning to strip the wrong stain from a mounted fireplace mantel—preserving its rustic character—in under three hours.
Read Full Case StudyPreserving the Details: Stripping a Weathered Front Door in Under Five Hours
How ALR Springfield franchisee Terrence Ondatje used laser cleaning to strip a weathered front door for a new stain application—preserving its intricate wood details—in under five hours.
Read Full Case StudyPreserving the Details: Stripping a Weathered Front Door in Under Five Hours
How ALR Springfield franchisee Terrence Ondatje used laser cleaning to strip a weathered front door for a new stain application—preserving its intricate wood details—in under five hours.
Read Full Case StudyFrom Franchise Training to an Emergency Project: ALR's Work with Western Global
An emergency call during a franchise training session: water had rusted the interiors of four roughly 9-by-9-foot cube fuel tanks. ALR corporate responded alongside a newly trained franchisee on their very first project — and Western Global shared a video review of the result.
Read Full Case StudyAn Emergency Recovery That Built a Lasting Relationship: ALR and Siemens Energy
Thirteen pallets of thin magnetic steel plates for power-generator production arrived from Germany with flash rust. Two ALR technicians recovered all 13 pallets in about a day and a half — the start of a relationship Siemens Energy has continued for years.
Read Full Case StudySolving a Bonding Challenge: ALR's Work with Nano Ceramic
ALR used laser cleaning and etching to prepare the bonding surfaces on Nano Ceramic's injection-molded parts — and a break test just 20 minutes after bonding was unable to delaminate the laser-treated joint.
Read Full Case StudyBringing Manufacturers Together: ALR's Collaboration with Flextur
Through project collaboration and demonstration days drawing hundreds of attendees, Advanced Laser Restoration and Ohio-based Flextur have introduced laser cleaning to the manufacturing community — with Flextur and others adopting the technology.
Read Full Case StudyFrom Rental Fleet to Franchise Ownership: Flagship Equipment's ALR Journey
An ARA Show introduction led Jacob and Cory of Flagship Equipment to add laser cleaning to their Erie, PA rental fleet, become Advanced Laser Restoration Erie PA franchisees, and pursue ALR's first Area Rep Franchise Location.
Read Full Case StudyBringing Laser Cleaning to the Rental Industry: ALR's Journey from Research to Rollout
After a year researching the rental market as an American Rental Association member, Advanced Laser Restoration launched a laser cleaning rental program — with Pennsylvania's Gap Power renting its first 500-watt machine daily.
Read Full Case StudyBringing Laser Cleaning into Focus at Dassault Aviation
Advanced Laser Restoration demonstrated laser cleaning at aerospace manufacturer Dassault Aviation — exploring paint preparation, corrosion removal, and aviation restoration through successful on-site demonstrations.
Read Full Case StudyFrom London to Wilmington: Omni Facilities Management Brings ALR Laser Cleaning to the UK
A discovery on social media led Omni Facilities Management's owner to fly from London to ALR's Wilmington office — resulting in the purchase of two 300-watt pulsed laser cleaning machines and ALR-led training in London.
Read Full Case StudyBehind the Scenes at JCB: Demonstrating Laser Cleaning for Weld Preparation
Advanced Laser Restoration ran two on-site demonstrations for JCB — first across a range of factory applications, then a focused session on weld preparation in JCB's production environment.
Read Full Case StudyBehind the Scenes at Bellagio: Demonstrating Laser Cleaning for MGM
ALR drove four hours to Bellagio for an extensive on-site demonstration for MGM — stripping wood components in under an hour and restoring submerged fountain piping to a like-new appearance.
Read Full Case StudyFrom Tire Mold Cleaning to an Equipment Sale: ALR Springfield's Michelin Project
How ALR Springfield franchisee Terrence Ondatje turned Michelin tire-mold cleaning into a live on-site laser demonstration with ALR corporate — and ultimately an equipment purchase by Michelin.
Read Full Case StudyMitsubishi Power: Integrating Robotic Laser Cleaning into Power Generation Restoration
How Advanced Laser Restoration integrated 1,000-watt pulsed laser cleaning with robotics into Mitsubishi Power's power generation restoration workflow — from on-site demonstration to implemented system.
Read Full Case StudyRestoring What Matters: Federal Reserve Bank of Atlanta
Stainless steel security bollards and seven corroded flagpoles restored at the Federal Reserve Bank of Atlanta, Jacksonville Branch — completed in under two weeks from first contact.
Read Full Case Study